‘Devastating’: Unite Scotland reveals Scottish Ambulance Service survey findings

Unite Scotland has today revealed the details of a ‘devastating’ survey conducted of nearly 300 Scottish Ambulance Service (SAS) workers. 

The survey conducted over the last month by the trade union among its SAS members reveals a ‘horrifying’ picture of the nation’s ambulance service due to years of ‘chronic underfunding’.

The survey reveals that by huge majorities SAS workers feel under-valued, fatigued; that staff morale has collapsed, with the vast majority of workers stating the nation’s ambulance service is under-resourced and under-staffed. 

Substantial majorities of SAS workers also state that they have considered leaving the ambulance service and reported that they have been abused at work in the last year.

The headline survey findings reveal the following:

  • 98.2% believe that Scottish Government’s extra investment of £20m into the SAS and support from the armed services will ‘not be enough’ during the winter months;
  • 88.2% do not feel valued by the Scottish Government and 84.6% do not feel valued by the SAS;
  • 86.7% of SAS workers felt that staff morale was either poor (30.8%) or very poor (55.9%);
  • 86.4% feel fatigued at work while 78.9% believe the SAS is under-staffed;
  • 81.5% have suffered verbal or physical abuse, or both, while working at the SAS within the last year;
  • 73.6% of respondents said they have considered leaving the SAS;
  • 70% do not get the necessary break times during shifts;
  • 53.8% stated that there were not enough ambulances at ‘station level’; and
  • 44.3% stated that the longest shift they have worked was between 12-15 hours, 30%between 15-20 hours; 17.5% between 10-12 hours while 5.7% stated it was under 10 hours and 2.5% over 20 hours. 

In a previous Daily Record Exclusive on 9 September, Unite called for a ‘major incident’ status to be declared at all hospitals with Accident and Emergency Units, where turnaround times exceed 30 minutes.  

The demand was made by Unite to protect the public who have made 999 calls in the community, amid patient safety concerns due to 6 hours service running times. 

On average, an ambulance response to a 999 call can take between 55 minutes, and 1 hour and 10 minutes, from call to completion. However, ambulances are now missing three 999 calls while located at a hospital waiting for patient handovers.  

The survey findings shed new light on this depressing situation with nearly 71% of respondents declaring that the longest 999 call they have been involved in from call to completion exceeded six hours: (16.3% – over 20 hours), (11.7% between 15-20 hours), (6.3% between 12-15 hours), (4.6% between 10-12 hours), (5.4% between 8-10 hours), and (26.4% between 6-8 hours), with the remainder being under 6 hours. 

Worryingly, 94.5% of survey respondents involved in ambulance 999 call-outs believed the clinical coding to ascertain the severity of the situation was wrong. In addition, 54.7% answered ‘yes’ to the question ‘due to longer service running times has your ‘call’ been involved in an adverse clinical event due to delays and hospital pressures?’

Unite Scotland has repeatedly warned the Health Secretary, Humza Yousaf, that the extra investment and resources for the SAS would ‘not be enough’ to deal with the crises affecting the nation’s health services, which the survey findings conclusively confirm. 

Pat Rafferty, Unite Scottish Secretary, in response to the survey findings, said: “I don’t think I have ever seen such an utterly depressing and horrifying situation with massive implications for the nation.

“The workers at the Scottish Ambulance Service are sending out their own 999 call to the Scottish Government saying that they are undervalued, stressed, and exhausted. It is now beyond breaking point.

“The levels of abuse the workers are suffering is inexcusable. The vast majority of those responding to our survey are going as far as to say they are now considering leaving the ambulance service.

“Shockingly, the survey reveals a culture of extremely long hours, partially due to chronic underfunding over many years, and the overwhelming stresses being placed on the system. This situation is directly leading to paramedics and ambulance staff being increasingly involved in adverse clinical events, and dangerously long response times.

“It is a devasting indictment of the Scottish Government’s approach to the ambulance service. Urgent action is necessary because lives are at risk alongside the fundamental issue of how we value those trying to save those lives.”

Unite Scotland: ‘Vaccination is not Immunisation’

FEARS OF NEW SPIKE

Unite Scotland has criticised Friday’s announcement by the Scottish government on workers suspected of contracting Covid not being required to self-isolate, stating that it could lead to a new spike in the pandemic.

As one of the nation’s leading trade unions in the health and social care sector, which has been significantly impacted by the pandemic, Unite has raised serious concerns directly with the Scottish government over its approach to level zero.  

The Scottish government has removed the blanket requirement for close contacts to self-isolate as long as they’re double vaccinated and take a PCR test. This includes removing the requirement for those working in health and social care to self-isolate as had previously been the practice throughout the pandemic.

According to the Scottish government figures, 1,825 new cases of Covid-19 were recorded in the past 24 hours on Thursday (22 July). Twenty-two new deaths have been reported of someone who tested positive for the virus over the past 28 days.

 In the week ending 20 July, on average 2,109 NHS staff, or around 1.2% of the NHS workforce, reported absent each day for a range of reasons related to Covid-19.

James O’Connell, Unite industrial officer, said: “There have been a growing number of cases of the delta variant in Scotland and we can’t allow this to spiral out of control. While we understand there is a need and desire to return to normality, we have got to remember that vaccination is not immunisation.

“Unite’s members, particularly in those vulnerable sectors such as health and social care, are extremely worried that we could see a new spike in hospital admissions, and it is the staff on the frontline having to deal with this.

“If you’re identified as a close contact it potentially takes 48 hours minimum for the virus to be detected through a test so there is a potential for staff to be asymptomatic without knowing they are positive for a period of time.

“Using the hierarchy of control risk should be removed or at least minimised as much as it can be, therefore, in order to remove or minimise the risk of spread you should isolate not gamble using health and social care staff as the test.

“They look after the most vulnerable people in our society, is it worth it?  The government is putting a lot of emphasis on double vaccination which does not stop contraction of the virus, however – why are they not looking at reducing the time between vaccine?”

A buyer for BiFab … but not Burntisland

Unions welcome announcement but slam Government inaction

Leading strategic infrastructure projects and physical asset lifecycle management company InfraStrata plc, is delighted to announce it has acquired the assets of the Scottish-based offshore energy fabrication company, Burntisland Fabrication (BiFab) Limited. The sites will trade under the Harland & Wolff name.

This highly strategic acquisition of assets and leases spans across two sites in prime Scottish locations with particular regard to renewable, oil & gas and defence projects: Methil on the east coast of Scotland and Arnish on the west coast of Scotland. The BurntIsland site will not form part of the transaction.

Both sites will trade under the Harland & Wolff brand and will represent the final fabrication piece of its UK footprint, positioning the company to fully deliver on its existing strategy quicker than it would have done with only its two existing sites: Harland & Wolff (Belfast) and Harland & Wolff (Appledore).

Methil, the larger of the two sites will be heavily focussed on fabrication for the oil and gas, commercial and renewables markets, whilst Arnish lends itself to multiple opportunities across all Harland & Wolff’s five markets: defence, oil & gas, renewables, commercial and cruise and ferry.

Through this strategic ambition across various geographical locations of the United Kingdom, InfraStrata emphasises its local and cross government support; aligned even closer to the UK Government’s “levelling-up” agenda and the “Green Industrial Revolution”.

The two Scottish sites will work symbiotically alongside Harland & Wolff (Belfast) and Harland & Wolff (Appledore). 

John Wood, CEO of InfraStrata, commented: “With this acquisition, we now have a footprint in Scotland, which is the hotbed for major wind farm projects as well as for shipbuilding programmes. We have now positioned ourselves strategically across the UK with four sites capable of servicing our five core markets.

“This acquisition gives us the flexibility to optimise our operations across the Group and offer our clients the ability to fabricate faster and de-risk their exposure by offering multiple sites.

“As we move into larger contracts, it is crucial that we demonstrate the capacity to bid for and deliver on these projects. The acquisition of Bifab’s assets delivers that capability to us and will open up a larger demographic of tender opportunities.

“Finally, I wish to warmly welcome the personnel whom we have taken on at Methil and Arnish and I am confident that we will turn these facilities into highly successful businesses that generate jobs and investment into their local economies in due course.”

Harland & Wolff is a wholly-owned subsidiary of InfraStrata plc (AIM: INFA), a London Stock Exchange-listed firm focused on strategic infrastructure projects and physical asset life-cycle management.

Harland and Wolff (Belfast) is one of Europe’s largest heavy engineering facilities, with deep water access, deep water quayside berths and vast fabrication halls, with the addition of Harland & Wolff (Appledore) the company will be able to capitalise on opportunities at both ends of the market where it has strategic and unique assets that will be much in demand.

In addition to Harland & Wolff, it owns the Islandmagee gas storage project, which is expected to provide 25% of the UK’s natural gas storage capacity and to benefit the Northern Irish economy as a whole when completed. It is anticipated that the gas storage project will bring significant fabrication and construction work to the shipyard during its construction phase.

GMB Scotland and Unite Scotland have welcomed the announcement that two of the three BiFab fabrication yards have been bought out of administration by InfraStrata.

BiFab, which had three fabrication yards in Fife and the Isle of Lewis, went into administration in December last year following the Scottish Government withdrawing previous financial guarantees to support the manufacture of eight turbine jackets for the Neart na Gaoithe (NnG) offshore wind project at the yards. 

InfraStrata as part of a £850,000 deal has bought the sites at Methil in Fife and Arnish on Lewis. It is understood that InfraStrata, which owns the Harland and Wolff shipyard in Belfast, will bring the Scottish sites under the Harland and Wolff name as it attempts to bid for offshore wind projects and shipbuilding contracts.

Unite and GMB have demanded concrete actions by the Scottish and UK Governments to strategically support the offshore wind sector. The trade unions criticised the announcement by the Prime Minister in October 2020 to commit 60 per cent of the turbines to be manufactured in the UK as ‘empty rhetoric’ without a review of the Contracts for Difference (CfD), which should include local content and enforcement clauses. 

The trade unions also cited the various powers relating to planning, renewables energy, procurement, the Crown Estate and Marine Scotland which the Scottish Government should be using to exercise greater leverage in the contractual process.

In a joint statement, Unite Scotland Secretary Pat Rafferty and GMB Scotland Secretary Gary Smith said: “The announcement by InfraStrata that two of the BiFab yards will be bought out of administration is welcome news. It is also testimony to our members and their communities who have fought hard to keep these yards alive.

“We look forward to working with the company to ensure it is primed to win contracts for the offshore wind sector, and to having a positive working relationship underpinned by the Fair Work principles. We have always believed that the BiFab yards, and indeed yards and ports all over Scotland, are uniquely placed to capture the benefits of the offshore wind sector.

“However, the story so far has been one of government failure – thousands of jobs and billions of pounds have been outsourced around the world when Scottish communities should have been benefitting from these contracts. Now the Scottish and UK Governments have been given a reprieve and they need to step-up and support the new ownership.

“We urgently need an overhaul of the Contracts for Difference process to ensure local supply clauses are in-built at the outset of major contracts as part of a proper industrial and investment plan for the sector, otherwise the green jobs revolution will remain a fantasy.”

Book launch – Shafted: The Media, the Miners’ Strike & The Aftermath (new edition)

FREE PUBLIC EVENT / SCOTTISH BOOK LAUNCH & SPEAKER EVENT

for new edition of 

Shafted: The Media, the Miners’ Strike and the Aftermath Continue reading Book launch – Shafted: The Media, the Miners’ Strike & The Aftermath (new edition)

Fair’s fair: Unite calls for devolution of employment law

disability_works_1

Unite Scotland has repeated it’s call for the devolution of employment law. The appeal follows Wednesday’s decision by the Supreme Court that the UK government was wrong to raise employment tribunal fees. Continue reading Fair’s fair: Unite calls for devolution of employment law