A record number of pupils in Scotland are being taught in schools in “good or satisfactory” condition, official figures show.
The 2024 School Estate Statistics show that a record 91.7% of school buildings, with a total of 647,773 pupils, are in a good or satisfactory condition.
This is an increase of 29 percentage points since April 2007. Since then, 1,139 school building projects have been completed.
Education Secretary Jenny Gilruth said: “This government is determined to deliver high quality learning environments for all pupils in Scotland – and a key part of that is delivering a world-class school estate.
“Positive school environments play a huge role in the education of Scotland’s young people and our investment is paying dividends, with a record high number of schools being in good or satisfactory condition.
“The Scottish Government is continuing its investment in the school estate through the £2 billion Learning Estate Investment Programme. As set out in our Programme for Government, construction will begin on a further eight school building projects over the next year.
“This means that by the end of 2027-28, Scotland will have seen 47 modern, state-of-the-art school buildings open, thanks to our investment.”
Inspections carried out by local authorities have shown that, at present, there are 16 council areas which have identified schools as containing Reinforced Autoclaved Aerated Concrete (RAAC).
Local authorities have responsibility to ensure schools are safe for pupils, staff and all their users, and are carrying out inspections of school buildings to identify the presence of RAAC. Ministers have been clear to local authorities that those must be carried out as a matter of the highest priority and have offered assistance to councils in the matter where appropriate.
Where RAAC has been identified, Councils have assured the Scottish Government that mitigations are in place in accordance with guidance from the Institution of Structural Engineers.
The schools currently impacted are in the following council areas:
Aberdeen City
Aberdeenshire
Argyll and Bute
City of Edinburgh
Dumfries and Galloway
Dundee City
East Ayrshire
East Lothian
Glasgow City
Highland
Inverclyde
Moray
North Ayrshire
North Lanarkshire
Perth and Kinross
West Lothian
Education Secretary Jenny Gilruth said: “The Scottish Government has been actively engaging with local authority partners, who have statutory responsibility for school buildings in Scotland, for some time.
“It is important that there is transparency around the schools where RAAC has been identified and mitigations in place. Local authorities were asked to publish by today the data relating to impacted schools in their area given the seriousness of this issue and to ensure this data is freely available.
“I hope this provides reassurance to parents, carers, staff and pupils who may be concerned about the presence of RAAC in their learning facilities. I also expect the local authorities still to publish to do so as a matter of urgency.
“Currently half of Scotland’s local authorities have identified RAAC in schools. COSLA has confirmed that safety is their central consideration and that there is robust guidance that is followed by every local authority to ensure that those buildings are safe to be in for pupils, staff and the public.
“This is in line with the existing guidance from the Institution of Structural Engineers who have advised us they do not believe there is sufficient grounds to update their advice.”
EDINBURGH REPORT:
Reinforced autoclaved aerated concrete (RAAC) is a lightweight construction material that was used in the construction of some public buildings between the 1950s and 1990s. It was mostly used mostly in flat roofing. Despite its name, it is very different to traditional concrete. It is aerated, or ‘bubbly’, and is therefore less durable than traditional concrete.
RAAC can be susceptible to failure when exposed to moisture. As a result UK Government has issued guidance to organisations across the UK to carry out check buildings where RAAC may have been used.
Since April 2023, we have been inspecting our schools to check for RAAC. The work is being carried out in line with UK Government advice. We have contracted independent structural engineers to do the surveys.
No schools have had to close as a result of RAAC.
These are the schools affected and the mitigations that are in place (as at 8 September 2023):
Colinton Primary School – no impact on the school
Cramond Primary School – one classroom block is closed, temporary classroom units on site
Currie Community High School – access still available to dining hall, old gym block, assembly hall and an art classroom are closed. Newer gym block still in use, some gym classes taking place outdoors
Fox Covert/St Andrew’s RC Primary School – gym hall/dining hall closed but likely to re-open after remedial works; kitchen closed for longer term
Lorne Primary School – top floor currently closed while assessment takes place; classes relocated within the school.
Pentland Primary School – four classrooms, kitchen and supporting areas not in use; numbers restricted in dining hall
Trinity Academy – swimming pool, no impact as building has been closed since 2014
Trinity Primary School – a classroom area and kitchen not in use; temporary classrooms on site.