London Road clock makes welcome return

The historic London Road clock has returned home after 15 years in storage and following its full restoration, as part of the Trams to Newhaven project.

The clock, which began life on Waverley Bridge in 1857 before being moved to the West End in 1896, was eventually placed at the roundabout on London Road in 1955. It was removed in 2007 during the original tram project and is now being replaced as Trams to Newhaven nears completion.

Specialist clockmakers Smith of Derby have carefully restored the clock, which has involved dismantling it, priming and repainting all parts, hand painting ornate features in gold and repairing the Coat of Arms of Edinburgh, including casting a new deer from aluminium.

The timepiece was returned to Elm Row on Tuesday (16 August) as part of improvements to the public space at Elm Row.

Councillor Scott Arthur, Transport and Environment Convener, said: “I’m sure the return of the London Road clock will be welcome news to many, and thanks to its full restoration it will add a striking finishing touch to the area’s transformation.

“It has a rich history, and I’m sure the clock has witnessed many amazing scenes in Edinburgh.”

John Lawson, City Archaeologist, said:It has been fascinating to work with Smith of Derby in restoring this iconic clock back to its original condition and with a new striking paint scheme reflecting what we believe to be close to its original Victorian look.

The process has proved more complex than first thought. What was thought to be a simple iron casting in four parts has been revealed by Smith’s conservation work to be a more intricate design, with individual detailed castings added separately to the main column. Along with the Elm Row pigeons, we hope the historic London Road Clock will be enjoyed by all and add to the area’s history.”

Trams to Newhaven remains on schedule for completion by spring 2023 and within the £207.3m budget, with all major construction anticipated to be complete by the end of 2022 ahead of a testing and commissioning period.

The main construction works between Montgomery Street/Annandale Street and Pilrig Street were completed last month (July). Main construction works are also complete on several other sections, including Ocean Terminal to Rennie’s Isle and between Tower Street and Constitution Place and Tower Street and Baltic Street.

Amongst the progress made to date, 93% of track slab has been laid (over 4km), all the necessary utility diversions have been carried out and main construction work is complete on four new tram stops at Constitution Street, McDonald Road, Ocean Terminal and Foot of the Walk, with works progressing well on the Balfour Street and Port of Leith stops.

Several other monuments and public artwork pieces have been refurbished and replaced as part of the project, including the Robert Burns statute at Bernard Street, which was restored and unveiled earlier this year.

In addition, the eight bronze pigeons will be returned to Elm Row this autumn, while work is ongoing to identify an appropriate location for Pilrig Cable Wheels discovered on Leith Walk.

Find out more about Trams to Newhaven online.

NHS Lothian encourages parents to get children vaccinated against flu 

NHS Lothian is encouraging parents and carers to help keep children healthy over the school terms this winter by getting them vaccinated against flu. All primary and secondary school pupils are eligible for the vaccine, which is given in schools as a painless nasal spray.

Getting children vaccinated against flu reduces the chances of them missing class time and other activities due to illness and helps prevent them passing the illness to vulnerable family members.

Consent packs containing a letter, leaflet and consent form will be sent home to parents and carers of school children on return to school in August. Secondary pupils can self-consent, though they are encouraged to speak to a parent or carer first.

Letters with appointment details for children aged two to five years who are not yet at school will begin to arrive at homes from September.

Parents and carers should call the number on their child’s letter if their child has missed their appointment or needs to reschedule.

The nasal spray is a quick and painless way of delivering the flu vaccine to children and should start to provide protection within 10-14 days.

Pat Wynne, Nurse Director for NHS Lothian who is overseeing this year’s programme, said: “Getting the nasal spray flu vaccine is the best way to protect your child and those around them. The flu virus changes over time so your child needs to get the vaccine each year to help stay protected.

“Please look out for your child’s consent pack, which they will receive through school from August, and ensure that their completed consent form is returned on time if you wish them to receive the vaccine.”

Public Health Minister Maree Todd said: “Schools are back but we want to keep flu out, which is why all primary and secondary school children are being offered the free flu vaccine.

“Flu can be serious, even for healthy children, so the vaccine offers the best possible protection for your child and those around them who may be more vulnerable to flu. Getting your child vaccinated can help prevent them getting sick, from spreading flu, and requiring time off school and away from other activities.”

School children will receive the flu vaccine in school between September and December. Parents of two to five-year-olds who are not yet at school will be given information about where their child will be vaccinated in their appointment letter. In a small number of cases, the nasal spray may not be suitable, and the vaccine can be given as an injection in the arm instead.

For more information about the flu vaccine, visit NHS Inform or call 0800 030 8013.

Winter Vaccines

Scotland’s Winter Vaccine Programme will see eligible groups invited forward for vaccination against flu and/or COVID-19.

Following advice from the Joint Committee on Vaccination and Immunisation (JCVI), the following groups will be offered both the flu and COVID-19 vaccines this year:

• aged 50 or over
• residents and staff working in a care home for older adults
• younger adults in long stay nursing and residential care settings
• frontline health and social care workers
• Those aged 5 to 49 years with an eligible health condition, including those with poorly controlled asthma
• Those aged 5 to 49 years who are:
– a household contact of someone with a weakened immune system
– an unpaid carer or a young carer (16 years or over)
– pregnant

The flu vaccine is also recommended for:

• people aged 16 to 49 years with an eligible health condition, including well controlled asthma
• children aged 6 months to 2 years with an eligible health condition
• all children aged 2 to 5 years (not yet at school)
• all primary and secondary school pupils
• nursery, primary and secondary school teachers and pupil-facing support workers in local authority and independent settings
• prison population and prison officers and support workers who deliver direct front-facing detention services.

Appointments for priority groups will be made available as the programme progresses – people in those groups should wait until they are contacted or called forward. Read the latest update from the Scottish Government here.